GAP 15

CityDüsseldorf
CountryGermany
ArchitectJSK Architects
Construction period2003 - 2006

The office complex was realized as part of a partnership business model in 24 months of construction time. GAP 15 consists of a 90-meter high-rise building with 24 floors above ground, a five-story underground car park, and a five-story low-rise building. The two parts of the building are connected by a bridge and a glass roof. The high-rise was built using an elaborate top-down method.

Copyright © HOCHTIEF/Wolfgang Kleber

HOCHTIEF Infrastructure GmbH
Hamborner Straße 55
40472 Düsseldorf • Deutschland
Tel: +49 211 90809-0
Fax.: +49 211 90809-8172

www.hochtief-building.de

Similar projects in segment High-rise buildings
Zuellig Building

Zuellig Building • Makati City• Philippines

555 Mission Street

555 Mission Street • San Francisco, CA• USA

King George Central Office Tower

King George Central Office Tower • Brisbane, QLD• Australia