Riga Airport

CityRiga
CountryLatvia
Construction period2013-2014

The upgrades HOCHTIEF Solutions has been contracted to perform at Riga Airport between May 2013 and August 2014 were quite extensive: two new halls, new taxiways and de-icing platforms, refurbishment and drainage of the takeoff and landing strips and the runways, extension of the apron, runway and apron lighting. Riga’s is already the most vital airport in the Baltic region; the upgrade increased its capacity and improved safety standards to make Riga a hub for Northern European air traffic in the long term. Operations continued uninterrupted during the 16-month construction period.

Copyright © Vladislavs Punculs/Riga

HOCHTIEF Engineering GmbH
Alfredstraße 236
45133 Essen • Deutschland
Tel: +49 201 824-1436
Fax.: +49 201 824-2742

www.hochtief-engineering.de

HOCHTIEF Infrastructure GmbH
Opernplatz 2
45128 Essen • Deutschland
Tel: +49 201 824-0
Fax.: +49 201 824-2777

www.hochtief-infrastructure.de

Similar projects in segment Airports
Wroclaw Airport

Wroclaw Airport • Wroclaw• Poland

San Diego International Airport

San Diego International Airport • San Diego, CA• USA

Sacramento Airport Terminal Modernization

Sacramento Airport Terminal Modernization • Sacramento, CA• USA