City | Brisbane, QLD | |||
Country | Australia | |||
Client | RiverCity Motorway | |||
Contract type | Design and construct (Joint Venture) |
CPB Contractors (formerly Leighton Contractors), along with its consortium partners was responsible for the finance, design, building and operating of Brisbane’s first privately financed toll road, the Clem Jones Tunnel. CLEM7 links five existing major motorways and arterial roads on the north and south sides of the Brisbane River. The 6.8-kilometer tollway includes twin, 2–lane, 4.8-kilometer tunnels. The project also includes a state of-the-art fully electronic tolling system and unique urban design and landscaping concepts that complement the subtropical lifestyle and liveability of Brisbane.The tunnel was opened in March 2010, some seven months earlier than the contracted date, and CPB Contractors in joint venture is the Operations and Maintenance (O&M) contractor.
More references for CPB Contractors transportation infrastructure
CPB Contractors Pty Limited
Corporate Office
Level 18
177 Pacific Highway
NSW 2060 North Sydney • Australien
Tel: +61 2 8668 6000
Fax.: +61 2 8668 6666
www.cpbcon.com.au