Newhaven energy recovery facility

CityNew Haven
CountryUnited Kingdom
Completion2012

Several HOCHTIEF units collaborated to build a waste incinerator in southeast England. It generates electricity for some 16,000 households from 210,000 metric tons of domestic waste each year. Besides developing the plant’s design, we served as the general contractor for the construction pit, earthwork operations, shell and interior work, facade, heating system, air conditioning, and ventilation. Our engineering units also developed a special construction process to minimize the impact on groundwater levels, and managed the entire design and approval process. The plant officially commenced operations in mid-2012.

Copyright © HOCHTIEF UK/Ackermann

HOCHTIEF (UK) Construction Ltd.
Whitehill House Windmill Hill Business Park, Whitehill Way
SN5 6PE Epsilon • Großbritannien
Tel: +44 1793 755555
Fax.: +44 1793 755556
uk@hochtief.de
www.hochtief.co.uk

HOCHTIEF Engineering GmbH
Alfredstraße 236
45133 Essen • Deutschland
Tel: +49 201 824-8281
Fax.: +49 201 824-8556

www.hochtief-engineering.de

Similar projects in segment Power plants
Macarthur Windfarm

Macarthur Windfarm • Macarthur, VIC• Australia

Calaveras Dam

Calaveras Dam • Sunol, CA• USA

La Confluencia hydroelectric power station

La Confluencia hydroelectric power station • Chile